Exterior paint - trim only (porch, soffit, fascia)
$580/ job
Flooring4
LVP install + prep + transitions
$3.20/ sq ft
Carpet + pad install (bedroom)
$0.62/ sq ft
Tile install (bath floor)
$7/ sq ft
Subfloor repair/replace
$3.70/ sq ft
Kitchen3
Cabinet install flat fee (sm kitchen 10-15 lf)
$200/ job
SS double-bowl sink + chrome faucet + install
$285/ job
Backsplash - subway tile install
$16/ sq ft
Bathroom6
Steel tub + 3-piece acrylic surround (install)
$880/ job
Tub refinish (keep existing)
$150/ job
Vanity + top + faucet + install (30")
$585/ job
Toilet replace (wax ring + supply)
$238/ job
Medicine cabinet + mirror install
$115/ job
Interior bath door + casing + hardware
$200/ job
Plumbing6
Walkthrough + written condition report
$150/ job
Replace corroded supply line (per fixture)
$125/ each
Water heater (40-gal gas) replace + install
$925/ job
Tankless water heater install
$1,900/ job
Rough-in bath (full)
$1,270/ job
Rough-in kitchen
$640/ job
Electrical7
Walkthrough + code review (licensed)
$225/ job
Outlet replace (device + labor)
$7/ each
Switch replace (device + labor)
$7/ each
GFCI install (kitchen/bath/exterior)
$10/ each
Flush-mount light fixture install (basic)
$20/ each
Smoke/CO detector combo install
$45/ each
Panel upgrade to 200A
$2,000/ job
Framing2
New interior partition wall (frame + drywall both sides)
$70/ lin ft
Add bedroom to existing space (frame + drywall + door)
$600/ job
Landscaping6
Tree removal (small, under 30ft)
$400/ each
Tree removal (medium, 30-60ft)
$750/ each
Tree removal (large, 60ft+)
$1,275/ each
Mowing (single visit)
$70/ visit
Yard cleanup + haul brush pile
$370/ job
Hedge/shrub trim
$195/ job
Misc1
Final cleaning (post-rehab)
$275/ job
Make-Ready (Turnover)5
Rekey - front + back door (covers both doors; qty 1 per property)
$50/ each
Rekey - each additional door
$25/ each
Light clean (1-2 BR apt)
$95/ each
Deep clean 1-2 BR apt
$125/ each
Deep clean 2-4 BR house
$175/ each
Paid within 7 days of the PM approving finished work. On jobs over $5,000, 10% is held until the final walkthrough. Rates are for labor; Better Built Supply provides materials unless the job says otherwise. A job's own work items set the final pay.