Short answer: to choose a remodeling contractor in Green or Akron, Ohio, get two or three written quotes on the same scope, confirm the company’s city or county registration and its trade licenses, ask for a certificate of insurance, find out who pulls the permit, and read how payments, change orders and the warranty work before you sign. The checklist and questions below cover each step.

This guide is written for homeowners and property owners in Summit and Stark County. It applies whether you hire Better Built Ohio or another company.

What should I check before hiring a remodeling contractor?

What questions should I ask a contractor before signing?

  1. Who will be on site every day, and who is my single point of contact?
  2. Which trades do you do in-house, and which do you subcontract?
  3. Who pulls the permit and schedules inspections?
  4. What is included in this price, and what is an allowance that could change?
  5. How are change orders priced and approved? (Ask for written approval before any extra work.)
  6. What is the payment schedule, and what milestone triggers each payment?
  7. When will materials be ordered, and what happens if something arrives damaged?
  8. What is the expected start date and length of the job?
  9. What warranty do you give on labor, and who handles manufacturer warranties on materials?
  10. How do you protect the rest of the house and handle daily cleanup and debris?
  11. How do you communicate during the job: text, email, scheduled updates?
  12. Can I see a sample contract before I commit?

How do I compare remodeling quotes fairly?

The most common mistake is comparing a labor-only quote with a quote that includes materials, or a quote with low allowances with one that prices actual selections. Put the quotes side by side:

Compare What to look for Red flag
Scope Same rooms, same work list, same measurements Vague lines like “remodel kitchen”
Materials Named products or clear allowance amounts Very low allowances that will grow later
Permits and inspections Contractor pulls and schedules them Asks you to skip the permit
Payments Deposit and payments tied to milestones Most of the money due before work starts
Change orders Written price approved before extra work Verbal “we’ll settle up at the end”
Warranty Labor warranty written into the contract No written warranty
Insurance Certificate sent by the agent Can’t produce one

What are the red flags when hiring a contractor?

Should I hire one company or separate trades?

Hiring separate trades yourself can save a coordination fee, but you become the scheduler and the person who settles disputes between trades. One company that handles the whole job gives you one contract, one schedule and one party responsible if something needs fixing. For a single trade job, such as a bad outlet or a leaking drain, a service call may be all you need.

Where does Better Built Ohio fit?

Better Built Ohio is one option to put on your list. It is a licensed and insured remodeling and construction company in Green with in-house carpentry and its own materials showroom, Better Built Supply, so cabinets, countertops and flooring can be chosen and installed under one quote. Electrical work is done by Ohio Inspired Electric, Ohio License #51741. Service calls are $99 for the first hour, then $90 per hour. See all services, browse materials at Better Built Supply, or read how Better Built Ohio works.

Better Built Ohio and the Better Built Supply showroom are at 445 E Turkeyfoot Lake Rd, Suite 100, Green, OH 44319. Hours are Monday–Friday 10 AM–5 PM, Saturday 10 AM–2 PM, and Sunday by appointment. Call or text 330-801-8219.

Frequently asked questions

How do I check a contractor's license in Ohio?

Ohio does not issue a statewide license for general remodeling contractors, so ask which city or county registration the company holds and confirm it with that building department. Electrical, plumbing and HVAC contractors are licensed by the Ohio Construction Industry Licensing Board, and you can look up a license number on the state’s eLicense Ohio website.

How many quotes should I get for a remodel?

Two or three written quotes on the same scope are usually enough to see whether a price is reasonable. Give every contractor the same measurements, finish selections and list of work so the quotes can be compared line by line.

Who should pull the permit on a remodel in Green or Akron?

The contractor doing the work should normally pull the permit and schedule inspections. Ask about this before you sign; if a contractor asks you to pull the permit as the homeowner, ask why.

How much deposit is normal for a remodeling contractor?

Deposit amounts vary by company and project, and larger deposits are common when custom materials have to be ordered. What matters most is that the deposit amount and the payment schedule are written into the contract and tied to clear milestones.

Do I have a right to cancel a home improvement contract in Ohio?

Under Ohio’s Home Solicitation Sales Act, a contract signed at your home with a seller who came to you generally can be cancelled within three business days, and the seller must give you written notice of that right. Read the cancellation section of any contract before you sign.

Where is Better Built Ohio located?

Better Built Ohio and the Better Built Supply showroom are at 445 E Turkeyfoot Lake Rd, Suite 100, Green, OH 44319. Hours are Monday through Friday 10 AM to 5 PM, Saturday 10 AM to 2 PM, and Sunday by appointment. Call or text 330-801-8219.

Related guides

Leave a Reply

Your email address will not be published. Required fields are marked *

🦏 Rhino Capital Loan Partners
Broker, agent, or CPA with borrowers? Get paid to refer them →
🚀 Investor Hub · free signup
Join →
Book Service Call